SUPERINTEND INSTALLATIONS


VRE-80M installed in a rack.The panel has 4 pcs of VRE-80M monitoring units that are used as close range monitoring points. PC is used to monitor the Electrical System of the whole office building. In this case there are altogether 17 pcs of VRE-80M units, which equals 136 monitoring points. On the computer screen one green block equals one monitoring device and the color green signifies that there are no problems.

This shows the previous rack with the upper door open. On the right you can see the wiring of the monitoring units and on the background there are signal cables that are connected to other monitoring units around the building.

VRE-80M is installed on the door of a cabinet. On the background there are 3 pcs of VMI-35 sum current transformers.

VMI-95 sum current transformers.

VR-14US/100UL mounted on a DIN rail.

VR-14F monitoring unit installed with a flush mounting kit.

Same as before but the door of the control unit is open. Sum current transformer VMI-25 is shown inside the cabinet.